Plumbing
Bathroom installation
Whether this needs a licence in Ireland
No licence required
Taken from the statute below; not yet reviewed by a lawyer
Bathroom installation: what the job involves
Refitting a bathroom or en suite from bare walls: taking out the old suite, moving supplies and waste where needed, waterproofing and tiling, and fitting the new bath or shower, toilet, basin and taps. The plumber usually coordinates an electrician and a tiler.
Also asked for as: bathroom fitter · bathroom refit · new bathroom · en suite installation · wet room
How the job is usually done
- Survey the room: water pressure, hot water system, waste route and the falls available for the toilet and shower.
- Agree the layout and the suite, and who supplies the sanitary ware and tiles.
- Strip out the old suite, tiles and boxing, and isolate water and electrics.
- First fix: run new supplies and wastes, fit any shower valve and the electrician’s first-fix wiring.
- Prepare walls and floor, tank wet areas and tile or panel.
- Second fix: fit the toilet, basin, bath or tray, taps, shower and towel rail.
- Test every supply and waste, seal joints, and the electrician tests and certifies their part.
Bathroom installation: what is included
Usually included
- Removal of the old suite and the plumbing first and second fix
- Connecting supplies, wastes and the toilet to the soil stack
- Silicone sealing and testing for leaks
Usually not included — agree it separately
- Electrical work, which a Registered Electrical Contractor does and certifies
- Tiling, if priced by a separate tiler
- Skip or waste removal of the old suite
- Plastering, painting and new flooring outside the wet area
- Moving the soil stack, which is building work rather than plumbing
Materials and who supplies them
- Sanitary ware, taps and shower: supplied by the customer from a showroom, or supplied and fitted by the plumber
- Pipe, fittings, valves and waste traps: supplied by the plumber
- Tiles and adhesive: usually chosen by the customer; tanking kit supplied by the fitter
- Extractor fan and lighting: supplied and fitted by the electrician
How long it takes
Usually one to three weeks from strip-out to finish; longer for a wet room, moving the toilet, or waiting on tiles and a made-to-measure screen.
When to book
Showroom lead times for screens, vanities and tiles are often several weeks, so order before the strip-out date is fixed.
Bathroom installation: the rules in Ireland
What the official sources say, checked against them on the date shown. A summary, not legal advice — follow the link to read the rule itself.
Plumbing is not a restricted trade in Ireland: there is no statutory register of plumbers. The restricted works are electrical (Safe Electric) and gas (RGI), and they often sit next to plumbing.
Applies to: the homeowner choosing a plumber
Commission for Regulation of Utilities · cru.ie · Checked 9 October 2026
Electrical work in a bathroom or shower room, and any new circuit such as one for an electric shower, is Restricted Electrical Works: only a Registered Electrical Contractor may do it, and they must issue a Completion Certificate.
Applies to: the electrician on the job, and the homeowner who hires them
Safe Electric Ireland, under the Commission for Regulation of Utilities · safeelectric.ie · Checked 9 October 2026
Foul drainage from a new bathroom must be adequate and hygienic under Part H of the Building Regulations, with traps, ventilation of the drain and access for clearing.
Applies to: the installer and the homeowner
Building Regulations Part H, Department of Housing · gov.ie · Checked 9 October 2026
Where the plumber supplies an expensive suite or cylinder, the two-thirds rule can change the VAT rate on the whole invoice, so ask whether the quote is VAT-inclusive.
Applies to: VAT-registered contractors
Revenue Commissioners · revenue.ie · Checked 9 October 2026
What bathroom installation costs, and why
What jobs on Talqero came to
Not enough comparable jobs yet to publish a range here. Talqero shows a price range only once at least five comparable jobs, agreed prices or offers exist — a range from fewer would describe a handful of jobs, not the market. Post your job and compare the offers you get.
What affects the price
- Whether the toilet, shower or bath move, which changes the waste runs and floor work
- Wet room or standard shower tray, and how much of the room is tanked and tiled
- Who supplies the suite and tiles
- The hot water system and pressure, which decide the shower and whether a pump is needed
- Condition of the floor, walls and existing pipework once the old suite comes out
- Electrical work: extractor, lights, shaver socket, towel rail or electric shower circuit
- VAT: building work on a home is charged at the reduced rate of 13.5% by a VAT-registered business — unless the materials come to more than two-thirds of the price, when Revenue’s two-thirds rule applies the goods rate to the whole job. Ask whether a quote includes VAT.
Paperwork to ask for at the end
- Safe Electric Completion Certificate for the electrical work
- Manufacturer guarantees for the shower, valve, toilet and enclosure, registered in your name
- A note of where the isolating valves and any pump are
Safety
- Older bath panels, floor tiles and boxing can contain asbestos; if the house is pre-2000 and something looks like old fibre board, have it checked before strip-out.
- A heavy cast iron bath or a full-depth bath of water needs a sound floor — the fitter should check joists before a large bath goes in.
Bathroom installation: before you hire
Questions to ask a tradesperson
- Who does the electrical work, and will I get a Completion Certificate?
- How will the shower area be waterproofed under the tiles?
- Is removal of the old suite and waste included?
- What happens to the price if the floor is rotten underneath?
- Are the photos of first-fix pipe runs something you can send me?
What you can do yourself
Painting and fitting accessories are reasonable DIY, but supplies, waste and anything electrical in a bathroom are not — bathroom electrics are restricted by law.
What to put in your task
- What are you replacing?
- Will anything move from where it is now?
- Which shower do you want?
- Who will supply the suite and tiles?
- Roughly how big is the room?
Photos that help
- The whole room from the doorway
- The room from the opposite corner
- Behind and around the toilet, showing the waste pipe
- The hot press or cylinder and any shower pump
- The ceiling, showing any extractor fan
Bathroom installation by county
Choose your county for bathroom installation close to home.
- Bathroom installation in Dublin
- Bathroom installation in Cork
- Bathroom installation in Galway
- Bathroom installation in Kildare
- Bathroom installation in Limerick
- Bathroom installation in Meath
- Bathroom installation in Tipperary
- Bathroom installation in Donegal
- Bathroom installation in Wexford
- Bathroom installation in Kerry
- Bathroom installation in Wicklow
- Bathroom installation in Mayo
- Bathroom installation in Louth
- Bathroom installation in Waterford
- Bathroom installation in Clare
- Bathroom installation in Kilkenny
- Bathroom installation in Westmeath
- Bathroom installation in Laois
- Bathroom installation in Cavan
- Bathroom installation in Offaly
- Bathroom installation in Sligo
- Bathroom installation in Roscommon
- Bathroom installation in Monaghan
- Bathroom installation in Carlow
- Bathroom installation in Longford
- Bathroom installation in Leitrim
Plumbing
Need bathroom installation? Describe the job.
Post it once, free. Professionals near you reply with their own price and when they could start. You choose, and pay them directly.
Questions about bathroom installation
Does bathroom installation need a licence in Ireland?
No licence is required for this work in Ireland (source: www.cru.ie). Ask instead for references and photographs of similar jobs.
Does a plumber need to be registered to fit a bathroom?
No. Plumbing has no statutory register in Ireland. The electrical part — lights, extractor, shower circuit — is restricted, so a Registered Electrical Contractor must do it and issue a Completion Certificate.
What is tanking and do I need it?
Tanking is a waterproof membrane under the tiles in the wet area. Tiles and grout are not waterproof on their own, so a walk-in shower or wet room should always be tanked.
Can I move the toilet to the other side of the room?
Usually, if the new position can reach the soil stack with enough fall. On a concrete floor it may mean breaking out a channel; on timber it depends on the joist direction.
Will the bathroom be out of use the whole time?
Most fitters keep a toilet working overnight where they can, but expect several days with no shower. If it is the only bathroom, ask about the plan before the start date.