County Kilkenny: 40.5% of households here are in dwellings built before 1981.
Whether this needs a licence in Ireland
Licence required
Registered Electrical Contractor (Safe Electric)
Registered Electrical Contractor (Safe Electric), issued or supervised by the Commission for Regulation of Utilities. Ask for the registration number before the work starts and check it on the public register. Check the register: www.safeelectric.ie
Wording approved by Talqero; not yet reviewed by a solicitor
Solar panels near Piltown
- Solar panels in Carrick-on-SuirCarrick-on-Suir, Co. Tipperary · 5.0 km
- Solar panels in WaterfordWaterford city · 19 km
- Solar panels in ClonmelClonmel, Co. Tipperary · 25 km
- Solar panels in TramoreTramore, Co. Waterford · 25 km
- Solar panels in New RossNew Ross, Co. Wexford · 28 km
- Solar panels in KilkennyKilkenny city · 34 km
- Solar panels in DungarvanDungarvan, Co. Waterford · 35 km
- Solar panels in ThurlesThurles, Co. Tipperary · 48 km
- Solar panels in EnniscorthyEnniscorthy, Co. Wexford · 56 km
Solar panels: what the job involves
Fitting solar photovoltaic panels on the roof (or on the ground nearby), with an inverter, often a battery, and a connection to the house supply, so the home makes some of its own electricity and can sell the surplus to its supplier. A registered electrician must connect it and ESB Networks must be told.
How long it takes: Usually one to two days on site; longer for a split array across two roofs, a battery in an awkward place or a fuse board change.
The full guide to solar panels — the steps, what is included, the Irish rules, paperwork and questions to ask.
What solar panels in Piltown costs, and why
What jobs on Talqero came to
Not enough comparable jobs yet to publish a range here. Talqero shows a price range only once at least five comparable jobs, agreed prices or offers exist — a range from fewer would describe a handful of jobs, not the market. Post your job and compare the offers you get.
What affects the price
- System size in kWp and the number of panels
- A battery, and its capacity
- Roof type, height and access, and whether scaffolding is needed
- Cable run from the roof to the inverter and fuse board
- Condition of the existing fuse board
- Extras: immersion diverter, EV charger readiness, bird mesh
- VAT: building work on a home is charged at the reduced rate of 13.5% by a VAT-registered business — unless the materials come to more than two-thirds of the price, when Revenue’s two-thirds rule applies the goods rate to the whole job. Ask whether a quote includes VAT.
County Kilkenny: what the figures say
40.5% of households in County Kilkenny live in homes built before 1981 — close to the national figure of 40.7%, and the 10th highest share of the 26 counties.
Homes of that age were built before modern insulation standards and usually gain most from attic and wall insulation — and SEAI’s attic and wall grants cover homes built and occupied before 2011.
Central Statistics Office, 2022
Rules and grants for solar panels
The rules in Ireland
Grant-aided insulation must be done by a contractor on SEAI’s register, after grant approval, with a BER afterwards.
- Use a contractor on SEAI’s register and get grant approval before any work starts — work begun before approval is not grant-aided.
- The grant must be drawn down within eight months of the offer, and a BER by a registered assessor after the works is required (SEAI contributes €50 towards it).
- Since 27 July 2026, external wall insulation of up to 15 cm is exempt from planning permission.
What to ask before you choose
- Are you on SEAI’s contractor register for this measure?
- Have I got grant approval in place before you start?
- What ventilation will the house need afterwards?
- Who arranges the BER after the works?
- Is VAT included?
What the work usually involves
- Internal dry-lining of external walls
- Attic and cavity insulation
- Draught-proofing
- Work towards a better BER
What to put in your task
- The type and rough age of the house
- Which rooms or walls
- Your current BER, if you have one
- Whether you are applying for a grant
County Kilkenny in figures
Construction as a whole. The CSO does not publish enterprise counts per trade at county level, so this figure is not a count of any one trade.
Solar panels · Piltown
Need solar panels? Describe the job.
Post it once, free. Professionals near you reply with their own price and when they could start. You choose, and pay them directly.