Skip to content
Talqero

Passage West, Co. Cork

Outdoor and garden lighting in Passage West, Co. Cork

Lighting for a garden, drive or entrance, wired and protected for outdoor use. Post your task free and professionals working in Passage West reply with their own price. You choose, and pay them directly.

County Cork: 43.0% of households here are in dwellings built before 1981.

Whether this needs a licence in Ireland

Ireland

Licence required

Registered Electrical Contractor (Safe Electric)

Registered Electrical Contractor (Safe Electric), issued or supervised by the Commission for Regulation of Utilities. Ask for the registration number before the work starts and check it on the public register. Check the register: www.safeelectric.ie

Wording approved by Talqero; not yet reviewed by a solicitor

Outdoor and garden lighting near Passage West

Outdoor and garden lighting: what the job involves

Wired lighting for a garden, patio, driveway, path or front door, plus outdoor sockets and supplies to sheds and garden rooms, using weatherproof fittings and buried or protected cable. Outdoor electrics are a special location under the National Rules and are Restricted Electrical Works.

How long it takes: A few wall lights near the house usually take half a day; garden lighting with trenching or a supply to a garden room can take one to three days.

The full guide to outdoor and garden lighting — the steps, what is included, the Irish rules, paperwork and questions to ask.

What outdoor and garden lighting in Passage West costs, and why

What jobs on Talqero came to

Not enough comparable jobs yet to publish a range here. Talqero shows a price range only once at least five comparable jobs, agreed prices or offers exist — a range from fewer would describe a handful of jobs, not the market. Post your job and compare the offers you get.

What affects the price

  • Number of lights and sockets and how far they are from the house
  • Trenching through lawn, beds or paving
  • Fittings: wall lights, bollards, uplighters, recessed deck lights
  • Controls: timers, PIR sensors, photocells, smart switches
  • Spare capacity and RCD protection at the fuse board
  • VAT: work on a home is charged at the reduced 13.5% rate by a VAT-registered contractor, unless materials exceed two-thirds of the price; ask whether the quote includes it
  • VAT: building work on a home is charged at the reduced rate of 13.5% by a VAT-registered business — unless the materials come to more than two-thirds of the price, when Revenue’s two-thirds rule applies the goods rate to the whole job. Ask whether a quote includes VAT.

County Cork: what the figures say

  • 43.0% of households in County Cork live in homes built before 1981 — above the national figure of 40.7%, and the 3rd highest share of the 26 counties.

    Houses of that age were wired to older standards, so adding circuits there often starts with testing the existing installation and, frequently, a new fuse board with RCD protection.

    Central Statistics Office, 2022

Rules and grants for outdoor and garden lighting

The rules in Ireland

Most electrical work in a home is Restricted Electrical Works and must be done by a Registered Electrical Contractor, who gives you a Completion Certificate.

  • Restricted Electrical Works include new installations, fuse-board (distribution board) changes, new or replacement circuits, and inspection and testing. Minor like-for-like work such as replacing a switch is excluded.
  • The requirement comes from the Electricity Regulation Act 1999 and S.I. 264 of 2013, in force since 1 October 2013, and is run for the Commission for Regulation of Utilities by Safe Electric Ireland.
  • A Registered Electrical Contractor must issue a Completion Certificate for all work except minor works. Ask for it as soon as the job is done; insurers and solicitors ask for it later.
  • Check a contractor on the Safe Electric register before work starts.

What to ask before you choose

  • What is your Safe Electric registration number?
  • Will you issue a Completion Certificate for this work?
  • Does the price include testing, making good and removing old fittings?
  • Will the existing installation need work before you add to it?
  • Is VAT included?

What the work usually involves

  • New sockets, switches and light fittings
  • Rewiring an older house, room by room or all at once
  • Replacing a fuse board and adding RCD protection
  • Finding a fault that keeps tripping the power
  • EV charger points and outdoor lighting

What to put in your task

  • What is wrong or what you want added, room by room
  • Roughly how old the house and the wiring are
  • Whether the power trips, and when it started
  • Photos of the fuse board and the area where the work is

County Cork in figures

Active construction enterprises
7,910
Central Statistics Office, 2023
Homes built before 1981
43.0%
Central Statistics Office, 2022
Homes heated by natural gas
34.8%
Central Statistics Office, 2022
Homes heated by oil
39.2%
Central Statistics Office, 2022

Construction as a whole. The CSO does not publish enterprise counts per trade at county level, so this figure is not a count of any one trade.

Outdoor and garden lighting · Passage West

Need outdoor and garden lighting? Describe the job.

Post it once, free. Professionals near you reply with their own price and when they could start. You choose, and pay them directly.

More electrical services in Passage West

County Cork