Skip to content
Talqero

Durrus, Co. Cork

House extension in Durrus, Co. Cork

Building an extension. Anything above the exempted size needs planning permission, and larger work is notifiable to building control. Post your task free and professionals working in Durrus reply with their own price. You choose, and pay them directly.

County Cork: 43.0% of households here are in dwellings built before 1981.

Whether this needs a licence in Ireland

Ireland

Licence required

Building Control notification and assigned certifier

Building Control notification and assigned certifier, issued or supervised by the Local authority building control. Ask for the registration number before the work starts and check it on the public register. Check the register: www.gov.ie

Wording approved by Talqero; not yet reviewed by a solicitor

House extension near Durrus

House extension: what the job involves

Building a single- or two-storey extension to a house: a kitchen-living room, a ground-floor bedroom, a bigger bathroom. It runs from design and the planning question through foundations, walls, roof and services to finishes, and the builder’s management of the trades is a large part of what you are paying for.

How long it takes: Usually three to six months on site for a single-storey extension, after design and any planning; two storeys, difficult ground, weather and slow decisions on finishes lengthen it.

The full guide to house extension — the steps, what is included, the Irish rules, paperwork and questions to ask.

What house extension in Durrus costs, and why

What jobs on Talqero came to

Not enough comparable jobs yet to publish a range here. Talqero shows a price range only once at least five comparable jobs, agreed prices or offers exist — a range from fewer would describe a handful of jobs, not the market. Post your job and compare the offers you get.

What affects the price

  • Floor area, number of storeys and roof type
  • Ground conditions and foundations: rock, high water table, trees, drains to divert
  • Opening up the existing house: steel, lintels and the number of walls removed
  • Specification of windows, roof lights, kitchen, bathroom and finishes
  • Design, engineering and building-control certification
  • Access for machinery and materials, especially to the rear of a terraced house
  • VAT: building work on a home is charged at the reduced 13.5% rate by a VAT-registered builder, unless materials are more than two-thirds of the price (Revenue’s two-thirds rule)
  • VAT: building work on a home is charged at the reduced rate of 13.5% by a VAT-registered business — unless the materials come to more than two-thirds of the price, when Revenue’s two-thirds rule applies the goods rate to the whole job. Ask whether a quote includes VAT.

County Cork: what the figures say

  • 43.0% of households in County Cork live in homes built before 1981 — above the national figure of 40.7%, and the 3rd highest share of the 26 counties.

    Older houses often bring damp, uneven floors and outdated services into an extension or renovation; a survey before work starts is worth its fee.

    Central Statistics Office, 2022

Rules and grants for house extension

The rules in Ireland

Since 27 July 2026, a rear extension of up to 45 m² is exempt from planning permission under conditions, and building work still has to meet the building regulations.

  • Class 1 (rear extensions): exempt up to 45 m² in total, counting every extension built since 1 October 1964; the part above the ground floor is limited to 12 m² for terraced and semi-detached houses and 20 m² for detached houses, and must be at least 2 m from a party boundary.
  • The extension may not be higher than the house’s walls and roof, must leave at least 25 m² of private open space, and its roof may not be used as a balcony.
  • Sheds and garden rooms (Class 3) are exempt up to 30 m², not in front of the house; side or rear dormers up to 30 m³ are also newly exempt.
  • A Commencement Notice is lodged with the Building Control Authority through the BCMS portal 14 to 28 days before work starts; larger works need it with documentation and statutory certification, or an opt-out for a single dwelling. Check the requirement for your job with your council.

What to ask before you choose

  • Are you pricing from drawings and a specification, and which revision?
  • Who handles the Commencement Notice and any certification?
  • What is excluded — electrics, plumbing, finishes, skips?
  • What insurance do you carry, and can I see it?
  • How are payments staged against the work done?
  • Is VAT included?

What the work usually involves

  • Blocklaying and garden walls
  • Groundworks and foundations
  • Damp-proofing
  • Garage and attic conversions

What to put in your task

  • What you want built or changed, with rough sizes
  • Whether you have drawings or planning permission
  • Access for machinery and where waste can go
  • When you would like it started and finished

County Cork in figures

Active construction enterprises
7,910
Central Statistics Office, 2023
Homes built before 1981
43.0%
Central Statistics Office, 2022
Homes heated by natural gas
34.8%
Central Statistics Office, 2022
Homes heated by oil
39.2%
Central Statistics Office, 2022

Construction as a whole. The CSO does not publish enterprise counts per trade at county level, so this figure is not a count of any one trade.

House extension · Durrus

Need house extension? Describe the job.

Post it once, free. Professionals near you reply with their own price and when they could start. You choose, and pay them directly.

More building and renovation services in Durrus

County Cork